Please note: Head office and sites will be closed from Monday, December 23rd and will resume normal business hours Thursday, January 2nd.

Westminster and Elizabeth House, Fleet

Creating 30 modern apartments in a change-of-use redevelopment project in the heart of Fleet, Hampshire.

sector

Residential

cost

< £10 Million

type

Interior Fit-Out

status

Completed

Client & brief

Shaviram is a private equity investment group established in 2013, who have transformed both residential and commercial investment properties into state-of-the-art developments.

The client identified a gap in the market for modern, high-spec apartments in Fleet, Hampshire. After identifying and securing the perfect building in the optimal location, the client needed a turnkey contractor to complete a full strip-out, reconfiguration and refurbishment. Westminster House & Elizabeth House benefit from being in an excellent location close to Fleet high street, just a short walk from supermarkets, shops and eateries.

Get in touch

"We have worked with DRG on a number of projects, and they are an absolute pleasure to do business with. The project managers are great at communicating clearly, and the team is hard-working and reliable. They have the right balance between being professional and friendly, which makes it easy to work with them. We would highly recommend them!"

The Shaviram Group - Westminster & Elizabeth House

What can DRG do for you?

By choosing us, you can be safe in the knowledge that your construction or refurbishment project will be delivered to the highest standard, with low environmental impact.

Whether you are looking for a main contractor for general works or major works, we deliver on time and on budget. Working collaboratively with our clients, we create a built environment that helps communities live, work and grow stronger.

Get in touch

The DRG solution

Having worked closely with the client on previous commercial residential projects, DRG was delighted to support the Shaviram Group in their new venture. Working within the existing structure, the project kicked off with a full strip-out. Once key areas of the structure had been made good, such as windows, roof and façade, the fit out began, with internal partitioning and doors added to create the apartments. All apartments were individually finished, and featured spacious, open plan living spaces and modern appliances, with carefully chosen fixtures.

Externally, drainage was improved, a stand-alone bike store was built, and landscaping and outdoor lighting was added, along with electric vehicle (EV) charging points.

Key features

  • Strip-out
  • Façade works
  • Windows
  • Full fit-out, including internal partitioning and refurbishment
  • Electrics, connectivity and plumbing
  • External and groundwork including drainage, landscaping, lighting and electric vehicle (EV) charging points
  • New build stand-alone bike store

The result

The project was completed in March 2020, and Westminster and Elizabeth House are now home to 30 high-spec one and two-bedroom apartments.

Project specification

The apartments

  • Video access for residents
  • Grey double-glazed performance windows
  • LG Hausys deco plank sun-dried oak floor to living areas
  • Carpet to bedrooms
  • Water and electricity individually metered for each apartment
  • Dimplex electric radiators – complete with local controls and thermostats
  • High-specification bathrooms
  • Integrated kitchens and appliances
  • Stainless steel contemporary door furniture

The MEP services

  • Fibre broadband
  • LED downlights
  • Sockets, switches and USB points, plus video entry phone system
  • Wiring for TV, telephone and SKY Q points
  • Hard-wired smoke and heat alarms

The site

  • Secure onsite parking
  • Secure cycle store
  • Electric vehicle (EV) charging points
  • CCTV camera monitoring of external areas, lift lobbies and entrances